EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
MartysRV14A
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (453)
Research
Workshop
- (4)
Empennage
- (54)
Wings
- (84)
Fuselage
- (47)
Avionics
- (31)
Engine
- (40)
Propeller
Firewall Forward
- (41)
Controls
Lighting
- (2)
Instrument Panel
- (3)
Fuel System
- (1)
Finish
- (63)
-
Koger sunshade
-
Main Gear Fairings
-
Nose Gear Fairing
-
Nose Gear
-
Nose Gear Fairing
-
Nose Gear Fairing
-
Nose Wheel Fairing
-
Nose Wheel Fairing
-
Main Wheel Fairings
-
Wheel Fairings
-
Left Wheel Fairing
-
Relocate Left Wheel...
-
Wing Jack
-
Wheel Fairings
-
Canopy
-
Wing Root Fairings
-
Wing Root Fairings
-
Tail Light
-
Wing Root Fuel Filters
-
Light Check-Out
-
Wing Attachment -...
-
Wing Attachment
-
Interior Install
-
Empennage Fairing -...
-
Empennage Fairing -...
-
Empennage Fairing -...
-
Empennage Fairing -...
-
Mount Tail Feathers
-
Check List Prior to...
-
Flap Motor; A/C;...
-
Cabin Heat Controls
-
Access Panels
-
Misc Finish Items
-
Canopy Completion
-
Rear Canopy and Seat...
-
Wrap-Up
-
Windshield Fariing...
-
Windshield Faring -...
-
Windshield Faring -...
-
Seat Backs
-
Nose Gear
-
Canopy Fairing
-
Canopy and Fairing
-
Canopy Wrap-Up
-
Canopy Painting cont.
-
Canopy painting
-
Canopy Continued
-
Canopy Drilling
-
Canopy Installation
-
Forward Top Skin
-
Canopy and Access...
-
Canopy
-
Engine Mount
-
Main Gear Install
-
Main Landing Gear
-
Various Interior Finish
-
Interior Painting
-
Insulation
-
38.4 Rear Canopy
-
38.3 Canopy Rail...
-
38.2 Canopy Latch
-
38.1 Rear Canopy
-
Finish Kit Delivery
Painting
- (2)
Inspection
- (3)
Insurance
- (1)
Air Cond
- (35)
Cowling Mod
Interior
- (1)
Transport
- (4)
Training
- (2)
Final Assemb
- (4)
Pre-Flight
- (4)
Flight
- (19)
Maintenance
- (7)
Performance
- (1)
Builder Name:
Martin Guinn
-
Project:
Vans - RV-14A
-
VIEW REPORTS
Total Hours:
1990.5
Total Flight Time:
36.1
Total Expense:
N/A
Start/Last Date:
Aug 30, 2019 - Dec 06, 2021
Engine:
Lycoming YIO-390-A3B6 Thunderbolt
Propeller:
Hartzell
Panel:
G3X Touch/GTN 650xi, SteinAir
Friendly URL:
https://eaabuilderslog.org?s=MartysRV14A
Home or Last Project Picture
Nov 02, 2021
Nose Gear Fairing
- (4 hours)
Category: Finish
Started working on nose gear fairing. Completed all steps to drilling hinges.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.